Articolo | Classificazione ISO 16890 | Classe di filtrazione EN779 | Classe di filtrazione EN1822 | Larghezza (mm) | Altezza (mm) | Profondità (mm) | Portata (m3/h) | Perdita di carico iniziale (Pa) | Peso (kg) |
---|---|---|---|---|---|---|---|---|---|
Std | ePM1 75% | F7 | 592 | 592 | 292 | 4250 | 135 | 8 | |
XL | ePM1 75% | F7 | 592 | 592 | 292 | 4250 | 125 | 8,5 | |
Std | ePM1 80% | F8 | 592 | 592 | 292 | 4250 | 145 | 8 | |
XL | ePM1 80% | F8 | 592 | 592 | 292 | 4250 | 135 | 7 | |
Std | ePM1 85% | F9 | 592 | 592 | 292 | 4250 | 170 | 8 | |
XL | ePM1 85% | F9 | 592 | 592 | 292 | 4250 | 160 | 8,5 | |
Std | E10 | 592 | 592 | 292 | 4250 | 210 | 8.5 | ||
metà taglia | ePM1 75% | F7 | 592 | 287 | 292 | 1700 | 135 | 5 | |
Half size | ePM1 85% | F9 | 592 | 287 | 292 | 1700 | 170 | 5 | |
metà taglia | E10 | 592 | 287 | 292 | 1700 | 210 | 5 | ||
Std | E11 | 592 | 592 | 292 | 4250 | 230 | 8.5 | ||
Std | E12 | 592 | 592 | 292 | 4250 | 310 | 9 | ||
Std | H13 | 592 | 592 | 292 | 3400 | 330 | 9 |
Fai un upgrade alla filtrazione GT per ridurre le carbon emissions per MWh prodotto
TurbomacchineCase Study: An energy plant on the pacific coast upgrades to the camgt 4v-300 air inlet filters after tests show its water and salt handling capabilities.
Turbomacchine Case StudiesCase Study: EGAT North shifted to Camfil Filters and saved $1.4M USD in Yearly Power Degradation.
Case Study: Achieving high reliability and availability compression systems for LNG export sites.
Case Study: One of the world's Oil & Gas majors had severe problems associated with the operation of their gas turbines. Frequent peaks in inlet air pressure and short filter replacement intervals led to high operational costs.
Case Study: Comparison Test indicates a potential of $937 000 USD savings over a six-year timeframe by upgrading to EPA.
Case Study: Dalkia, a leader in the French gas turbine market, launched a national comparative test to increase power production by improving air filtration efficiency.
Soluzioni retrofit per piattaforme offshore
Case Study: Retrofit Solutions For Tata Power Ltd. Based on the site survey, Camfil proposed replacement of the pulse filter system with a three-stage static/barrier filter system, considering the local environment filled with refineries and a thermal power plant nearby.
Case Study: Camfil Wins Dalkia Over Four Competitors. Dalkia designed 12 testing benches to compare four air filtration combinations on three sites in France with different operating environments. Four competitors were free to select their best combinations.
Il principale produttore indipendente di energia in Thailandia gestisce centrali a ciclo combinato a turbine a gas con un output di 1.600MW ciascuna, con quattro turbine a gas M701F4, due turbine a vapore e sei generatori.